最美情侣中文字幕电影,在线麻豆精品传媒,在线网站高清黄,久久黄色视频

歡迎光臨散文網(wǎng) 會員登陸 & 注冊

Bratislava port eyes LNG terminal

2021-05-10 15:20 作者:_多言數(shù)窮  | 我要投稿

奧地利和斯洛伐克邊界,LNG 液化站,不知道Capacity, 2026年上

The idea is to produce LNG at a site on the river and use it for fueling river boats.? They will also fill LNG trucks for distribution inland.

One thing not mentioned in the article is where the gas is coming from that will be made into LNG.

---------------------

A liquefied natural gas (LNG) terminal,?which will cost approx €40 million,?is being built in a public port in Bratislava, Slovakia.

The development of the LNG terminal in the public port of Bratislava is currently in the preparation phase, the port informed in its statement.

The LNG terminal will be located on the main course of the Danube and will span 5,500 square metres.

The LNG terminal will consist of facilities for LNG production, for refueling of road tanks, for LNG storage, and for bunkering of ships.

By supporting the introduction of infrastructure for alternative fuels, the project wants to reduce greenhouse gas emissions and contribute to the greening of the port. This is a part of the EU plan to build the Rhine-Danube transport corridor, which aims to make transport greener.

The feasibility study published by the Slovak Republic’s Public Ports identifies the most suitable technology for the production and distribution of LNG for the port, based on a comparison of available technologies for liquefaction and storage of LNG on the market.

The construction is expected to begin next year, with completion expected in 2026.

Public Ports estimated the cost of building the terminal at around €40 million ($48.3 m) excluding VAT.


Bratislava port eyes LNG terminal的評論 (共 條)

分享到微博請遵守國家法律
白水县| 纳雍县| 麻江县| 大同市| 宁远县| 德化县| 彭州市| 武夷山市| 伊川县| 寿阳县| 二连浩特市| 股票| 封开县| 鄂伦春自治旗| 怀来县| 汉川市| 西峡县| 柳江县| 边坝县| 休宁县| 荃湾区| 阳西县| 钟山县| 烟台市| 临桂县| 枞阳县| 融水| 莆田市| 中西区| 隆德县| 汤原县| 荔浦县| 和林格尔县| 安多县| 翼城县| 平阴县| 观塘区| 竹溪县| 广西| 河津市| 江川县|